The weight of the bridge was equipped with double plane cable in double ground anchor range stretched across the river. The single plane cable and border lines stretched restrain structure based on pole bridge on the technology. Each cable lines consisted of sling since 11 - 65thWhen the problem with cable. Can be stretched or relaxed easily. Don't close the traffic like Rama 9 because each line cable wire. Within which is winding big maintenance and repair more difficult.The Council also yellow gold. The color of the promises of the king. When the light will shine beautiful, especially at night!