The designed capacity of BOS is 1500 kg for 3 shift but we may need 2 people per shift. So I think we can increase our cap to 300 kgs per shift per one operator if we can arrange the size and quantity perfectly. For vertical oven we need 6 min for 9 mm.7 min for 13 mm. 10 to 9 min for 19 mm. 12 to 14 min for 25 mm.wall. Pls make the study step by step. K. Nongyao pls help by giving full detail again to Dietmar.
For waste AFC can control at 10 to 12% plus loss by air 4 to 5 % so 15 to 18 % must be AFEU target. PLS DO NOT CUT TOO LONG on each side. For 200 cm. tube we should cut from 220 to 225 cm. and finish tube should be 206 cm. max. we must have PCL ( process control limit ) . In all tube. I will ask K. Nongyao to prepare for you.
I do not understand that we talk and we agree to pay for making the CE mark by you many month ago. Do you need any help from our technician ?
Anyway I ask Mr.Somchai to prepare all nessesary like catalogue and spec of machine to you And FOR SAW we will order and sent it to the plant ASAP.
THANKS.
Best Regards.
Pawat V.
Please talk with your people that we can go on very fast with all this points.