Manufacturing lead time for the outrigger bracker was two weeks. However, the Metal Fabricating Division had been able to coordinate supply and production with assembly operations. Consequently, finished in ventory levels of the outrigger bracket were kept to a minimum. B&L 's inventory holding costs were 20 percent per annum.