TECHNICAL ADVICE: Please provide a site plan showing the extents of the paved or shaded areas in the project boundary. Please provide calculation to show that 50% of the site hardscape (including road, sidewalks, courtyards, and parking lots) within the LEED project boundary is either shaded or paved with an SRI of at least 29. The site plan should include calculations showing the specific areas of these surfaces.