RE refrained from re-calculation of stability parameters as no slope has been
steeped but flattened and all 2008 results showed already stable conditions;
as the calculations are a first preliminary approach to the overall slope stability
of the Hongsa mine and dump, a continuous evaluation of slope stability will
be necessary in the future, to optimise the final slope inclination after BANPU
gained more geotechnical results during mining operation