prior high to high and then project the cycles forward from a swing low in
between these two highs.
The time relationships projected using three points that I use most
often are the following:
Low to high projected from another low (comparing swings in the
same direction)
High to low projected from another high (comparing swings in the
same direction)
High to high projected from an intervening low
Low to low projected from an intervening high