In the four cases studied, the characterization of the company
and the operation that owned the poka-yoke was based on both
observations and an interview (with the quality manager in companies
A and B, with the civil engineer responsible for the site in
company C). As for the interviews required as sources of evidence
for assessing the attributes, these were conducted in the three companies
with the operators of the work stations which had the PD.