The UA team positioned sensors inside the girder before the concrete was placed. Data from the sensors will help the research team determine which girder end zone detail performs best. Four 54-foot long concrete girders – one is a control girder with a traditional design – will be brought to the Large Scale Structures Lab on campus and tested with a load of close to 1 million pounds.