Steel pipes mounted in, bottom plate has been constructed, along with a cemented one meter exterior wall. Concrete flooring and roofing framework done one meter above boundary wall. Ceilings, gutters, doors, electrical wiring with lighting installed. Walls painted.
Dimensions: 20’ × 45’
Evaluated cost: Rf. 373, 500.00 (Three hundred and seventy three thousand five hundred Rufiyaa)