The services included
(1) perform visual inspection
(2) categorize bridges to minimize the work
(3) generate bridge database format by using the approach of IMMS Bridge Management System, BMS
(4) perform actual load test
(5) create computerized model by Finite Element Method, FEM
(6) perform load-carrying capacity assessment of bridges
(7) determine remaining life of bridges
(8) provide bridge reinforcement as required for U.20 loading
(9) provide the cost estimate for the rehabilitation
(10) perform the economic analysis; benefit per cost ratio, Economic Internal Rate of Return, EIRR, etc.
(11) provide national bridge rehabilitation plan and procedure. The total lump sum fee of this project is 25,989,230 baht.