The initial plan for the project was structured in two phases, so that execution would be possible from a constructive point of view and also in order to guarantee an acceptable level of usage of the rest of the installations while the work was being done. However finally, and after verifying the difficulties involved, in terms of both construction and site management, given the sheer scale that the project represented, it was decided that the work would be done in a single phase.