5.0 INSPECTION
The supplier is expected to conduct quality control and inspection sufficient to assure compliance
with this specification prior to delivery/shipment. Should it become apparent because of poor
molded pulp tray that a production lot may not comply; the ODM may call for an audit. If sampling
done in accordance with this specification show defect levels over the limits in section 4.0, the
production lot shall be rejected to the supplier or set aside for his inspection and sorting.