1. Ensure all machine been inspected accordingly to GP inspection check list (PD-403-01, PD-404-00, PD-405-02).
2. Manage main line production manpower assignment; ensure not less than 3 persons per shift.
3. Lead and organize the main line production according to the monthly production plan, ensure the production schedule as planned.
4. Ensure Main Line performing at it capacity.
5. Ensure sufficient material from Green end.
6. Liaise with all other relative departments; ensure main line production to be carried out as normal.
7. Ensure all routine cleaning work been carry out effectively.
8. Plan the cleaning work if there is any machine breakdown.
9. Check and plan the machine cleaning schedule.
10. Check the raw chemical stock and inform Production manager if have any abnormality.
11. Check RBS area and ensure proper stacking of raw board without corner and edge broken.
12. Ensure all main line production recipes under control.
13. Ensure all raw boards are meet GP standard of requirement.
14. Ensure the material consumption is meet GP standard requirement.
15. Ensure main line production under safe condition and prevent the accident to be happened, and report if any accidents happen in the related work area.
16. Report any damage of company properties.
17. Report any abnormalities to Production manager.
18. Any other job that require the attention from time to time.