Please see attached preliminary load out plan for Phase 46/2. As you can see the length of P3, P4 and P5 are quite equally long. The best way as I think is put P3 (is the shorter than P4 and P5 piles) and P2A underneath the P2 Piles but I’m not sure in the piles suite position as red mark and need your suggestion are as follow: