By running an anticipated production schedule through the manufacturing simulation model, Arena was able to find a design with the optimal amount of buffer space as well as the minimum system resources necessary to meet production goals. Various cost trade-offs were calculated with the model, balancing equipment and conveyor costs versus production throughput and volume.
eau)