We have the drawings from BDS, apparently these are 100% Design Development Drawings, according to BDS. It has been uploaded into the server by K Apiratch. A CD is on my desk.
Mid December, the Client expects our drawings. TC, any concerns from your side, any coordination meetings you require with K Kuk, please liaise directly with K BDS.
Noravee, as mentioned previously, I have a concern discharging un-disinfected effluent into the ground. I think you should address this issue in a timely manner even with the constraints that the site presents to us. Please come up with a viable solution and get back to me ASAP.
We have the drawings from BDS, apparently these are 100% Design Development Drawings, according to BDS. It has been uploaded into the server by K Apiratch. A CD is on my desk. Mid December, the Client expects our drawings. TC, any concerns from your side, any coordination meetings you require with K Kuk, please liaise directly with K BDS. Noravee, as mentioned previously, I have a concern discharging un-disinfected effluent into the ground. I think you should address this issue in a timely manner even with the constraints that the site presents to us. Please come up with a viable solution and get back to me ASAP.
การแปล กรุณารอสักครู่..