Effective since 8 May onward.
AI Supv. of each area to start this recall PM program on the used scaffold clamps in order to maintain its reliability like before. In order to make this campaign become efficiency to let all concerned can see your PM program.
Please manage your PM program per these suggestion:
1) Either AI Supv. or K. Montree start to coordinate to each other to AI Supv including AI foreman of each area to segregate the used clamps which need to recondition + lubricate by bring them back to LQ.
2) May consider to use any NDE to inspect crack randomly on the clamp body or stud bolts
3) Apply proper sandblast, coating by dipping, use anti seize to lubricate the stud bolts.
4) Record in your “Clamp maintenance inventory” for reference in the future or report out to AI Rep on a monthly basis.