The on-going implemented actions in placed were as following :
1. Define proper parameter for sealing alignment. Reset parameter of machine back to normal position in case foiled condom was jammed.
2. Set up proper spacing on the conveyor belt. The area must fit the foiled condom (cannot move or relocate)
3. Emphasize all packing operator to be aware of product quality compliance during operation and inspect product every 30 minutes by recheck both top and bottom especially on sealing area before put product into the flow wrap.
4. Perform 100 % visual check before loading product into the shipper carton.