Good morning, as per our conversation last Saturday about to method we recommend
Putting the packagae there is an option where we can Roll On the packages to the Vessel through SPMTs which is termed as Roll on/Load out.
The packages hence can be transported from the site (6 km which you specified) and stooled down temporarily at the port. The vessel must be a RO-RO vessel (in which the axles can come and go).
The SPMTs along with the package can go inside the vessel, stool down the package on stools and come out and so on for the other packages.
Please you submit the schedule of the job? Which month? so I need to know the time to prepare the commercials, Atleast the month is important.