Analyze Phase (2 slides, 3rd slide Optional)
Show summary of Potential X’s with Validation if Significant or Not
Mention Plan for DOE, which X’s to pursue with Interaction for Optimization (optional)
Hypothesis, then Show Graphical and Statistical Analysis of the most Significant X (should impact the Project Metric). Backup only the Non-Significant X’s