Fig. 3 shows the transient behaviours of the currents in
the points PLI, PL2 and in the no 1 rod of the earthhing
installation (see Fig. 4), computed for a 100 Rm value
of the ground resistivity, within the O-50 l.ts time
interval, with reference to a stroke on the structure at
the point A showed in figure 4.