• Kh. Yanchai to follow up with Kh. Pang to purchase berries from a supplier who has 4 kinds of berries.
• BQ cold kitchen to place little wet tissue on top of sandwich before clover with cling film.
• CT to ensure amuse bushe is served for lunch and dinner A la Carte guest.
• Stewarding to prepare complete clay pot for CT herb broth.
• All temp record complete on daily base and submit to Chef office by the 16th and 1st of each month.
• Production & purchase specification to be submit for each samples, both in hard and soft copy.
• AT 8kg cherry tomatoes reduced to 5kg.
• Pest control Tuesday 5th May 2015 ALL KITCHENS TO CLEAR AND CLEAN all cabinets.
• Kh. Yanchai to check green – yellow mango.
• CT to review the date of transfer as it’s the wrong date.
• Food samples most be collected and kept in the freezer of each function. Meeting package no need.
• Kh. Chet to make sure lamb leg is deboned.
• Kh. Jub Jub to follow up on nametag with Halal logo.
• Chefs in charge of buffet neither lunch nor dinner buffet most make sure menu are followed.
• PR for broken trolley is done.
• In Chefs absent 5 new topic most be mention in Chef briefing.
• All buffet most be cooked M
• Kh. Yanchai to make sure all paper is cleared in commissary.
• Do not use plum for fruit amenity, very sour try to do a compote or pickle.
• Prawn for prawn tower most be cleaned properly.
• Fig for CL = half, blu cheese mousse and half walnut.
• Kh. Jub Jub to prepare sign for Chef office.
• Kh. Toueng to check sauce for baked beans.
• Needs chocolate bar for B/Sweet.
• Stewarding to cleand the door front of compressor room and the panel front of all power control box floor 2, 3, 4.
• Place the food under the hot lamp.
• Stewarding send broken garbage din the engineering.
• CT to change date on transfer.
• If any kitchen is short of any items over a long weekend let me know and I can help if not if not your self have to pay?