We are requested by MC according to today meeting, as follows:
1. Feeder list of SUS1-4 which you have sent to us on pdf. Please send on xcel file, MC want to reproduce into their follow up file.
2.24Vdc: we would like to know the rquired load and location for our calculating of DC supply sizing and inform to MC.
3.We have received the MCC panel layout but there is no feeder name that can be checked back to compare with your feeder list. Please provide.
4. 230Vac supply from UPS for auxiliary supply: we would like to know your required load and location etc. for our sizing and design.
5.MC control room for C08 and D08: they will have a cable trench underneath the electrical room floor. Therefore, the incoming feeder of SUS2,3 and 4 shall be at the bottom of the incoming panel instead of on top as proposed.
Please let us have all these data by next Wednesday.