The Scintrex CG5 instrument makes an internal correction for drift and Earth tides however there is also an additional drift resulting from moving the meter about during the course of surveying. Base station ties were carried out every four hours. If the instrument Drift was over than 0.5 mGal a new loop was begun to keep the drift from running away.