Remote control of main generators shall be possible from the main switchboard and wheel house.
The “Stand by” generator set shall start up and connect automatically in case of:
- No voltage on the main switchboard
- Under/over voltage and frequency
- Overload
- Starting predefined heavy consumers
Automatic synchronizing and load sharing shall be provided
Local and remote Start/stop of generating sets shall be provided.