Preparation of the sample
It was ensured that foreign materials like earth, sand, gravel, sawdust, soap, detergents,
etc. did not enter the digester. The slurry was prepared and later poured into 500 ml
bottles. Tap water was added to the waste inside the 500 ml bottles. The slurry was fully
stirred manually with a piece of wood until there were no lumps.
According to the objective, it was necessary to design and realize the construction of:
Preparation of the sampleIt was ensured that foreign materials like earth, sand, gravel, sawdust, soap, detergents,etc. did not enter the digester. The slurry was prepared and later poured into 500 mlbottles. Tap water was added to the waste inside the 500 ml bottles. The slurry was fullystirred manually with a piece of wood until there were no lumps.According to the objective, it was necessary to design and realize the construction of:
การแปล กรุณารอสักครู่..
