The di parameters ~influence of transport cost i over user
attitude! adopted in this simulation are given in Table 4, and
the hj parameters taken as reference in the simulation appear
in Table 5. The term ‘‘other routine maintenance work’’ in
Table 5 refers to the remaining routine jobs that are not of
sufficient significance to warrant being included as a separate
activity.