In the work of the ANP company, we have a plan to manage and reduce the amount of time the beginning of all the production work, and reducing the problem of inventory. With the material requirements planning system management methods based on time or Just-in-time.
A method of production just in time. There are advantages to the company as follows:
- Must to control the material into the minimum level or zero (Zero Inventory.)
- Must to reduce lead time or lead time in the production process to a minimum or zero (zero lead time).
- We would like eliminate the problem of waste generated from the production to zero (zero failures).
- We have policy to eliminate a wasteland in production.