Where practicable, controlled storage shell be carried out to protect items that have passed inspection and are acceptable for either incorporation into the Works or dispatch, but especially for items which have passed final inspection, Incoming Material Inspection Form No. PAR-F-QA-009 shall be used for record inspection status of material.