For Thailand [37] , the construction cost and the operation and maintenance cost are generally estimated about 35% and 2% of the turbine cost, respectively. However , the percentage can be to some extant variable from one to another case in different countries .In this study ,the construction cost and the operation and maintenance cost can be estimated by Eq. (A2)
and (A3) respectively