Verify If the value is 1 or 0 then, the program will integrate into interface table and create the new record in item general table with process status equal to ‘1-Processed’.
2.3.2.2 Verify If the value is neither 0 or 1 then, the program rejects the record with error reason this program must be updates process status to be ‘2-Processed with Error’ in interface table (INTITMGNL).