This site is a manufacturing facility located in the northern Front
Range area of Colorado. The building is a single-story masonry
structure with a 4.9 m (16 ft) deep basement. It was constructed
during the years 1991 and 1992. The basement floor is a structural
floor over a crawlspace having a clearance of 1.2 to 1.5 m (4 to 5 ft).