As discussion, we would like to issue revised drawing to GTS on Monday. Please consider set of structure drawing for construction (A1) which we issued on11 Feb for Revision 1 as Mr.Lim's comments as follows,
1. Refer drawing no. S-03: - Structure level of Water Tank, Pump room& WTP (SSL-1.65, )are higher than Floor finishing level (FFL -1.75)
- Car lift pit level SSL is -2.10 but FFL is -2.20 and Passenger lift pit level as well.
- Please recheck area between grid line 4-5, D-E what we should have column support on ground floor slab plan, or not? (Steel column 're shown on sheet No. S-02 shown)
2. Refer drawing no. S-02 : - Please provide sunken and slope at car wash area and RATC area that you can check as equipment detail which Mr.Niwat sent to you.
And i have attached latest Ar. drawing file (21 Feb) that you can recheck again for Level at Driveway area.
We re looking forward to receiving your revised drawing. Thank you very much for your support.