Sep 2006 - May 2008
Company : Thai Rotary Engineering Public Company Limited.
Project : ATC Reformer and Aromatics Complex II, Rayong
Province ( PTT AR project )
Position : QC Inspector
Responsibility : Field erection inspection and welding inspection
for storage tanks.The inspection was carried out such as welds visual inspection, dimensional checks witness welder qualification test, conduct of air leak test, witness hydrostatic test Coordinated with NDT company and production dept.,Review RT film and report preliminary WPS’s conduct welding procedure test qualification, prepared inspection test and examination reports for submitted to owner for review before being hydrostatic test in accordance with requirements of project specifications, design codes and standards. (ASME Sect.V,VII, IX,API 650
Sep 2006 - May 2008
Company : Thai Rotary Engineering Public Company Limited.
Project : ATC Reformer and Aromatics Complex II, Rayong
Province ( PTT AR project )
Position : QC Inspector
Responsibility : Field erection inspection and welding inspection
for storage tanks.The inspection was carried out such as welds visual inspection, dimensional checks witness welder qualification test, conduct of air leak test, witness hydrostatic test Coordinated with NDT company and production dept.,Review RT film and report preliminary WPS’s conduct welding procedure test qualification, prepared inspection test and examination reports for submitted to owner for review before being hydrostatic test in accordance with requirements of project specifications, design codes and standards. (ASME Sect.V,VII, IX,API 650