in a blow to the plant's struggles with tight storage space. Tokyo Electric power Co. said about 120 tons of the water are believed to have breached the tank's inner linings, some of it possibly leaking into the soil. TEPCO is moving the water to a nearby tank at the Fukushima Dai-chi plant – a process that could take several days.