In fact, Stage 3 will also be too ambitious for most Spaghetti processes. It is always possible to generate process models as shown in Figs. 12.1 and 12.4 (Stage 2). Moreover, it is also possible to view dotted charts, create social networks, etc. However, it is very unlikely that all of these can be folded into a meaningful comprehensive process model as the basis (the control-flow discovered) is too weak.