After being reviewed, one (1) copy each of the said drawing and/or documents as detailed on the attached list (except those with actions "ACPT" , and/or "ACK") is being returned with the necessary action noted.
Please, therefore, furnish the revised or additional documents as required with in the designated dates specified in the subject contract.
one (1) copy each is being returned with the action of "Not reviewed".
This is due to the fact that the Calculations are missing.