A unique shallow 12-inch deep track slab design reduced the construction time and utility relocations. Maneuverability of the shorter and narrower streetcar vehicles has allowed the 8-foot wide track slab to be fitted to existing grades, limiting the scope of street and sidewalk reconstruction.