In contrast, if production cannot be shifted to another product, it may be necessary to shut down the facility until the materials resupply arrives, in which case the stockout cost depends on the length of time the facility is shut down. On average, the shutdown period is likely to be longer, and stockout cost higher, for smaller quantities of safety stock than for larger quantities.