Lockout procedure
1. Prepare for shutdown: gather required materials, notify appropriate personnel.
2. Shut down the equipment: Disconnect power/ shut down and release energy that can move any part of the machine (electricity, gravity, air/fluid/steam pressure, springs or mechanical).
3. Isolate the Equipment: Isolate the system from all energy sources.