For a time, the Riverside regeneration plant operated by hauling a
portion of the brine which contained about 70% of the salt to an
acceptable dumpsite. The remainder was recovered as above, while
some was discharged as very dilute solutions to the city sewer system.
The volume of brine hauled was 43,900 gallons.