This mix design currently contains a total of 410 kg of cement as this was the mix design used in the site trial. Our technical manager peter male is currently awaiting some cube results from the trials (due in next couple of days) to see if this cement content can be reduced. If possible can you await the outcome of this as there will probably be a change in the mix reducing the total cementitious content.