Waste power generation enterprises will step into the fields of
equipment manufacturing and construction in order to reduce
the project construction cost and improve the profitability at the
construction stage. There are three indices, namely, the equipment
utilization rate, the on-gird power generated by per ton of waste
and the disposal cost per ton of waste, which can be optimized
to improve the operation income of the projects and shift the cost
to the operating ends of flying ash and leachate disposal in reducing
the processing costs. By put the three indices into effect, the
internal rate of revenue of a project can be increased to 14%.