Some more points regarding the proposal:
1. Please clarify if there are any company or industry guidelines required. For example, Shell Technical Standards, API560, ASME VIII, etc.
If there is no requirement we will follow ASME VIII for the HRSG; API560 for the boiler.
2. Attached is the sample coil removal procedure.
3. CiTECH is primarily a WHRU designer and fabricator, process design of the whole system is not our expertise. As such we cannot design the control system or process, but we can advise.
Thank you for your patience and we shall submit our proposal by the 25th September.