Figure 13. Geotechnical Parameters vs. Depth after first phase of sand การแปล - Figure 13. Geotechnical Parameters vs. Depth after first phase of sand ไทย วิธีการพูด

Figure 13. Geotechnical Parameters

Figure 13. Geotechnical Parameters vs. Depth after first phase of sand spreading (a) bulk density (b) liquidity index (c) water content &Atterberg limits (d) void ratio after sand spreading (e) compression index
(f)coefficient of consolidation (g) preconsolidation pressure (h) overconsolidationratio
(i) field vane shear strength (j) sensitivity from vane share test
Failure During Sand Spreading
Although extreme care was taken during the sand spreading, a failure occurred at one location. Due to the unevenness of the original pond bed, sand formation of varying thickness was deposited. The process of sand filling attempted to achieve in uniform thickness of each sand layer, however investigation after the first phase of sand spreading showed sand formations varying from 1 to 7 m thickness. The resulting difference in additional load and differential fill pressure caused the soft slurry to be displaced towards the location with low fill pressure and the slurry burst through the thin sand cap near the center of silt pond. Evidence of this type of failure was confirmed in the post-failure investigation using wash-boring and marine Dutch Cone penetration tests. Heaved up clay was found in the silt pond over an area of 700 m by 500 m and the clay had heaved up as high as +2 mCD. Thecondition of the silt pond slurry after failure can be characterized as a very soft viscous liquid. The failure area is shown in Figure 14.


Figure 14. Layout of geofabric placement in the center of silt pond

Remedial Measures
The heaved up mud at the failure location was removed by a high capacity submersible mud pump. After the partial removal of the mud to 0 mCD, geotextiles of strength 150 kN/m by 150 kN/m with dimension of 700 m by 900 m were placed in two layers over the failure location and the surrounding areas prior to further sand spreading. Details of the design and construction method were discussed by Na et al. (1998). The layout of the geofabric placement is shown in Figure 14.
Second Phase of Sand Spreading
Following the placement of the geotextile in the silt pond, the second phase of sand spreading resumed. To enable sand to be spread up to +4 m CD with the spreading barge, the surrounding containment bund elevation was raised to +6 m CD and the water level in the silt pond was subsequently raised to +5.5 m CD. Hydrographic surveys were carried out following the completion of this phase of sand spreading to verify the actual build up of sand over the geofabric. This method of sand spreading was proceeded until the elevation of the silt pond reached +3.8 to +4 m CD. It took 8 months to reach the elevation +4 m CD. Altogether it took 21 months from the beginning of the first phase of sand spreading including placement of the geotextile.
Intermediate Mini-Cone Penetration Tests
When the fill level of sand the silt pond reached about +4 m CD, 100 numbers of marine mini-cone penetration tests were carried out using a 3 ton mini-seacalf mounted on a floating pontoon (Figure 15 ). The purposes of these tests were to determine the total thickness of the spread sand, to verify the success of sand spreading and to detect the possibility of any further local failures. The mini-cone penetration tests indicated a trend of a linear increase of cone resistance with depth for the sand found above the geofabric. This trend confirmed the formation of the spread sand in sufficient thickness over the geotextile. In addition to this, the mini-CPT also picked up lenses of sand which seemed to have intruded into the slurry in the first phase of sand spreading. The typical cone resistance profiles measured by the mini – cone is shown inFigure 16. The thickness of the sand profile determined by CPTs after reaching +4 m CD is shown in Figures 17and 18. It can be seen in these figures that there was a build up of 8 to 11 meters thickness of sand on top of silt pond material.

Figure 15. Mini- Seacalf

Figure 16.Typical cone resistance profile after sand spreading.

Figure 17.Cross-sectionl profile showing build-up of sand after sand spreading.
(Interpreted from mini CPT)


Figure 18. Thickness of built up sand after sand spreading interpreted from mini-CPT data.


Characterization of Soil after Sand Spreading
After the sand was filled up to the +4 m CD level, several interim boreholes were carried out to investigate the improvement of the slurry. An increase in bulk density, reduction in void ratio and, moisture content and a slight increase in preconsolidation pressure and undrained shear strength were registered from laboratory results of the interim boreholes. It can be seen that the liquidity index of the top 7 to 10 meters were still above unity and void ratios were above 2. Therefore the material up to 10 meters depth were still in a slurry stage. The comparison of geotechnical parameters before and after reclamation to +4 m CD levels are shown in Figure 19 (a to f).


Figure 19.Comparison of geotechnical parameters before and after sand spreading. (a) bulk density
(b) water content (c) Atterberg limit (d) liquidity index (e) void ratio
(f) preconsolidation pressure
Lowering of Ground Water Level
The next phase of construction in the silt pond was the lowering of the ground water in the siltpond to +3 m CD so that prefabricated vertical drains could be installed at elevation +4 m CD. This operation was carried out by opening the control sluice pipes that were installed in the silt pond sand bund prior to the resumption of sand spreading activities. Internal dewatering trenches together with a pumping scheme were provided to accelerate the lowering groundwater level.
Installation of Vertical Drains and Surcharges
After the sand filling, loose 4 to 10 meters thick sand layer overlies the thick slurry within the bund. Due to the slow process of filling combined with slow dewatering, the additional load on the slurry was gradually imposed. However, the pore pressure in the slurry was still high since only a limited quantity of pore water was drained out. In order to release the pressure, vertical drains were installed at 2 m square spacing. Initially some viscous liquid slurry came out through the annulus between mandrel hole and vertical drain. Thereafter clear water was released through the vertical drain. Subsequently, more sand was placed stage by stage up to +9 m CD throughout the silt pond.


Pilot Embankment
In order to investigate the deformation and pore pressure behaviour of the slurry-like soils, soil instrument clusters were installed after filling to +4 m CD. Instruments were installed in typical clusters including surface settlement plates, deep settlement gauges, pneumatic piezometers, electric vibrating-wire piezometers, open-type piezometers and water stand-pipes. The arrangement of each cluster in plan and elevation is shown in Figures 20.


0/5000
จาก: -
เป็น: -
ผลลัพธ์ (ไทย) 1: [สำเนา]
คัดลอก!
รูปที่ 13 ธรณีพารามิเตอร์เทียบกับความลึกหลังจากเฟสแรกทรายแพร่กระจาย (ก) จำนวนมากความหนาแน่น (ข) สภาพคล่องดัชนี (ค) น้ำเนื้อหาและ Atterberg จำกัดอัตราส่วน (d) ยกเลิกหลังจากทรายแพร่กระจายดัชนีรวม (e)(f) สัมประสิทธิ์ของ overconsolidationratio ความดัน preconsolidation (h) รวม (กรัม)(i) ฟิลด์ vane ไวแรงเฉือนแรง (เจ) จาก vane ร่วมทดสอบความล้มเหลวในระหว่างการแพร่กระจายทราย แม้ว่าดูแลมากถูกมาในทรายกระจาย ความล้มเหลวเกิดขึ้นที่สถานหนึ่ง เนื่องจากสีไม่สม่ำเสมอเตียงบ่อเดิม ถูกฝากทรายการก่อตัวของความหนาที่แตกต่างกัน กระบวนการบรรจุทรายพยายามเพื่อให้บรรลุในความหนาที่สม่ำเสมอของแต่ละชั้นของทราย แต่สอบสวนหลังจากเฟสแรกทรายแพร่กระจายพบว่าทรายก่อตัวที่แตกต่างกันจาก 1 ถึง 7 m หนา ความแตกต่างได้ในการโหลดเพิ่มเติมและเติมส่วนที่แตกต่างความดันเกิดน้ำอ่อนจะได้พลัดถิ่นไปยังสถานที่มีความดันต่ำเติมและสารละลายออกมาผ่านหมวกบางทรายใกล้บ่อตะกอน หลักฐานของความล้มเหลวชนิดนี้ได้รับการยืนยันในความล้มเหลวหลังใช้ เบื่อล้าง และทะเลทดสอบการเจาะรูปกรวยดัตช์ Heaved ค่าดินเหนียวพบในบ่อตะกอนบนพื้นที่ 700 เมตร 500 เมตร และดินเหนียวมี heaved ค่าสูงเป็นเฮิร์ด + 2 Thecondition ของน้ำบ่อตะกอนหลังจากความล้มเหลวสามารถมีลักษณะเป็นของเหลวข้นนุ่มมาก ตั้งความล้มเหลวจะแสดงในรูปที่ 14รูปที่ 14 เค้าโครงของ geofabric วางในบ่อตะกอนมาตรการเยียวยาการ heaved ค่าโคลนที่ความล้มเหลว ตั้งถูกเอาออก โดยปั๊ม submersible มัดจุสูง หลังจากเอาบางส่วนของโคลนให้เฮิร์ด 0 ลายนกของแรง 150 แหนบ kN/m โดย m 150 ช็อปปิ้งกับมิติของ 700 m โดย 900 m ถูกจัดวางในชั้นสองตั้งล้มเหลวและพื้นที่โดยรอบก่อนทรายการแพร่กระจาย รายละเอียดของวิธีการออกแบบและก่อสร้างได้กล่าวถึงโดยนา et al. (1998) เค้าโครงของการวาง geofabric จะแสดงในรูปที่ 14ระยะที่สองของทรายต่อตำแหน่งของ geotextile ในบ่อตะกอน เฟสสองของทรายที่กระจายการดำเนินต่อ เพื่อให้ทรายให้ แพร่กระจายถึง + CD m 4 มีเรือประมาณ ยกบันด์บรรจุรอบขึ้นไป + ซีดีม. 6 และระดับน้ำในบ่อตะกอนมาขึ้น +5.5 เมตร CD สำรวจ hydrographic ได้ดำเนินเสร็จสิ้นขั้นตอนนี้ทรายแพร่กระจายการตรวจสอบสร้างจริงค่าทรายผ่าน geofabric ต่อไปนี้ วิธีการแพร่กระจายทรายนี้มีครอบครัวจนถึงความสูงของบ่อตะกอนถึง +3.8 การ + 4 m CD ใช้เวลา 8 เดือนถึงยก + 4 m CD ทั้งหมด มันเอาต้นระยะแรกทรายแพร่กระจายรวมถึงตำแหน่งของ geotextile 21 เดือนกรวยกลางมินิเจาะทดสอบเมื่อระดับการเติมทรายบ่อตะกอนถึงเกี่ยวกับ + CD 4 m กรวยทะเลมินิเจาะทดสอบได้ดำเนินการใช้ seacalf-มินิที่ 3 ตันจำนวน 100 ติดตั้งบนแพลอย (15 รูป) วัตถุประสงค์ของการทดสอบเหล่านี้เพื่อ กำหนดความหนารวมของทรายกระจาย การตรวจสอบความสำเร็จของทรายที่แพร่กระจาย และ เพื่อตรวจสอบความเป็นไปได้ของความล้มเหลวใด ๆ เพิ่มเติมภายในได้ การทดสอบการเจาะรูปกรวยมินิระบุแนวโน้มของการเพิ่มขึ้นเชิงกรวยต้านความลึกสำหรับทรายที่พบข้างต้น geofabric แนวโน้มนี้ยืนยันการก่อตัวของทรายแพร่กระจายความหนาเพียงพอผ่าน geotextile นอกจากนี้ CPT มินิยังเบิกค่าเลนส์ของทรายซึ่งดูเหมือนจะมี intruded เป็นสารละลายในระยะแรกของทรายที่แพร่กระจาย โพรไฟล์ความต้านทานปกติกรวยวัด โดยมินิกรวยจะแสดง inFigure 16 ความหนาของโพทรายกำหนด โดย CPTs หลังจากถึง + 4 m CD จะแสดงในตัวเลข 17and 18 มันสามารถดูได้ในรูปเหล่านี้มีการสร้างขึ้นของ 8-11 เมตรความหนาของทรายอยู่ด้านบนของตะกอนบ่อวัสดุรูปที่ 15 มินิ - Seacalfรูป 16. กรวยทั่วไปค่าความต้านทานหลังจากทรายแพร่กระจายรูปแสดงเกิดทรายหลังจากทรายกระจายโปรไฟล์ 17.Cross-sectionl(แปลจากมินิ CPT)รูปที่ 18 ความหนาของสร้างขึ้นทรายหลังจากทรายแพร่กระจายตีความจากข้อมูลมินิ-CPTคุณสมบัติของดินหลังจากทรายแพร่กระจาย หลังจากทรายถูกเติมถึง m + 4 ระดับ CD, boreholes หลายชั่วได้ดำเนินการตรวจสอบการพัฒนาของสารละลาย การเพิ่มความหนาแน่นจำนวนมาก โมฆะเนื้อหาอัตราและ ความชื้นที่ลดลง และเพิ่มขึ้นเล็กน้อยความดัน preconsolidation และแรงเฉือน undrained ถูกลงทะเบียนจากผลปฏิบัติ boreholes ชั่ว จะเห็นได้ว่า ดัชนีสภาพคล่องสุด 7-10 เมตรก็ยังเหนือสามัคคี และถูกยกเลิกอัตราข้างต้น 2 ดังนั้น วัสดุได้ลึก 10 เมตรก็ยังอยู่ในระยะน้ำ แสดงในรูปที่ 19 การเปรียบเทียบของพารามิเตอร์ธรณีก่อน และ หลังถมระดับ m + 4 CD (มีถึง f)รูป 19.ธรณีพารามิเตอร์เปรียบเทียบก่อน และ หลังการแพร่กระจายทราย (ก) จำนวนมากความหนาแน่น (ข) น้ำ (c) เนื้อหา Atterberg จำกัด (d) ดัชนี (e) โมฆะอัตราส่วนสภาพคล่อง (f) แรงดัน preconsolidationลดระดับน้ำใต้ดิน เฟสถัดไปของการก่อสร้างในบ่อตะกอนถูกลดของน้ำใต้ดินใน siltpond การ + CD m 3 เพื่อที่สำเร็จระบายแนวตั้งสามารถติดตั้งที่ระดับ + 4 m CD การดำเนินการนี้ได้ดำเนินการเปิดท่อ sluice ควบคุมที่ติดตั้งในเซี่ยงไฮ้บ่อทรายตะกอนก่อนใหม่ให้ทรายกระจายกิจกรรม ได้ trenches แยกน้ำภายในพร้อมแบบสูบน้ำเพื่อเร่งระดับน้ำบาดาล loweringติดตั้งแนวท่อระบายน้ำ และเก็บเงินเพิ่มหลังจากกรอกทราย ชั้นทรายหลวม 4 ถึง 10 เมตรหนาอาร์กติกน้ำหนาภายในเซี่ยงไฮ้ เนื่องจากกระบวนการช้าของการบรรจุรวมกับแยกน้ำช้า โหลดเพิ่มเติมในสารละลายมีค่อย ๆ บังคับ อย่างไรก็ตาม ความดันรูขุมขนในสารละลายได้ยังคงสูงเนื่องจากจำกัดปริมาณเท่าน้ำรูขุมขนถูกระบายออกออก เพื่อปล่อยแรงดัน ท่อระบายน้ำแนวตั้งถูกติดตั้งอยู่ที่ 2 เมตรระยะห่างระหว่างตาราง เริ่มบางสารละลายของเหลวข้นออกมาผ่านใน annulus ระหว่างหลุม mandrel และท่อระบายน้ำแนวตั้ง หลังจากนั้นล้างน้ำออกผ่านท่อระบายน้ำแนวตั้ง ในเวลาต่อมา เพิ่มเติมทรายถูกวาง CD ขั้นโดยขั้นถึง + 9 m ทั่วบ่อตะกอนสถานีนำร่องการตรวจสอบที่แมพ และพฤติกรรมความดันของดินเนื้อปูนเช่นสารละลายรูขุมขน คลัสเตอร์เครื่องมือดินถูกติดตั้งหลังจากกรอกไป + 4 m CD เครื่องมือถูกติดตั้งในคลัสเตอร์ทั่วไปรวมทั้งชำระผิวแผ่น มาตรวัดจ่ายลึก piezometers นิวเมติก ไฟฟ้าลวดสั่นสะเทือน piezometers, piezometers เปิดชนิด และน้ำยืนท่อ การจัดเรียงของแต่ละคลัสเตอร์ในแผนและยกระดับจะปรากฏในตัวเลข 20
การแปล กรุณารอสักครู่..
ผลลัพธ์ (ไทย) 2:[สำเนา]
คัดลอก!
Figure 13. Geotechnical Parameters vs. Depth after first phase of sand spreading (a) bulk density (b) liquidity index (c) water content &Atterberg limits (d) void ratio after sand spreading (e) compression index
(f)coefficient of consolidation (g) preconsolidation pressure (h) overconsolidationratio
(i) field vane shear strength (j) sensitivity from vane share test
Failure During Sand Spreading
Although extreme care was taken during the sand spreading, a failure occurred at one location. Due to the unevenness of the original pond bed, sand formation of varying thickness was deposited. The process of sand filling attempted to achieve in uniform thickness of each sand layer, however investigation after the first phase of sand spreading showed sand formations varying from 1 to 7 m thickness. The resulting difference in additional load and differential fill pressure caused the soft slurry to be displaced towards the location with low fill pressure and the slurry burst through the thin sand cap near the center of silt pond. Evidence of this type of failure was confirmed in the post-failure investigation using wash-boring and marine Dutch Cone penetration tests. Heaved up clay was found in the silt pond over an area of 700 m by 500 m and the clay had heaved up as high as +2 mCD. Thecondition of the silt pond slurry after failure can be characterized as a very soft viscous liquid. The failure area is shown in Figure 14.


Figure 14. Layout of geofabric placement in the center of silt pond

Remedial Measures
The heaved up mud at the failure location was removed by a high capacity submersible mud pump. After the partial removal of the mud to 0 mCD, geotextiles of strength 150 kN/m by 150 kN/m with dimension of 700 m by 900 m were placed in two layers over the failure location and the surrounding areas prior to further sand spreading. Details of the design and construction method were discussed by Na et al. (1998). The layout of the geofabric placement is shown in Figure 14.
Second Phase of Sand Spreading
Following the placement of the geotextile in the silt pond, the second phase of sand spreading resumed. To enable sand to be spread up to +4 m CD with the spreading barge, the surrounding containment bund elevation was raised to +6 m CD and the water level in the silt pond was subsequently raised to +5.5 m CD. Hydrographic surveys were carried out following the completion of this phase of sand spreading to verify the actual build up of sand over the geofabric. This method of sand spreading was proceeded until the elevation of the silt pond reached +3.8 to +4 m CD. It took 8 months to reach the elevation +4 m CD. Altogether it took 21 months from the beginning of the first phase of sand spreading including placement of the geotextile.
Intermediate Mini-Cone Penetration Tests
When the fill level of sand the silt pond reached about +4 m CD, 100 numbers of marine mini-cone penetration tests were carried out using a 3 ton mini-seacalf mounted on a floating pontoon (Figure 15 ). The purposes of these tests were to determine the total thickness of the spread sand, to verify the success of sand spreading and to detect the possibility of any further local failures. The mini-cone penetration tests indicated a trend of a linear increase of cone resistance with depth for the sand found above the geofabric. This trend confirmed the formation of the spread sand in sufficient thickness over the geotextile. In addition to this, the mini-CPT also picked up lenses of sand which seemed to have intruded into the slurry in the first phase of sand spreading. The typical cone resistance profiles measured by the mini – cone is shown inFigure 16. The thickness of the sand profile determined by CPTs after reaching +4 m CD is shown in Figures 17and 18. It can be seen in these figures that there was a build up of 8 to 11 meters thickness of sand on top of silt pond material.

Figure 15. Mini- Seacalf

Figure 16.Typical cone resistance profile after sand spreading.

Figure 17.Cross-sectionl profile showing build-up of sand after sand spreading.
(Interpreted from mini CPT)


Figure 18. Thickness of built up sand after sand spreading interpreted from mini-CPT data.


Characterization of Soil after Sand Spreading
After the sand was filled up to the +4 m CD level, several interim boreholes were carried out to investigate the improvement of the slurry. An increase in bulk density, reduction in void ratio and, moisture content and a slight increase in preconsolidation pressure and undrained shear strength were registered from laboratory results of the interim boreholes. It can be seen that the liquidity index of the top 7 to 10 meters were still above unity and void ratios were above 2. Therefore the material up to 10 meters depth were still in a slurry stage. The comparison of geotechnical parameters before and after reclamation to +4 m CD levels are shown in Figure 19 (a to f).


Figure 19.Comparison of geotechnical parameters before and after sand spreading. (a) bulk density
(b) water content (c) Atterberg limit (d) liquidity index (e) void ratio
(f) preconsolidation pressure
Lowering of Ground Water Level
The next phase of construction in the silt pond was the lowering of the ground water in the siltpond to +3 m CD so that prefabricated vertical drains could be installed at elevation +4 m CD. This operation was carried out by opening the control sluice pipes that were installed in the silt pond sand bund prior to the resumption of sand spreading activities. Internal dewatering trenches together with a pumping scheme were provided to accelerate the lowering groundwater level.
Installation of Vertical Drains and Surcharges
After the sand filling, loose 4 to 10 meters thick sand layer overlies the thick slurry within the bund. Due to the slow process of filling combined with slow dewatering, the additional load on the slurry was gradually imposed. However, the pore pressure in the slurry was still high since only a limited quantity of pore water was drained out. In order to release the pressure, vertical drains were installed at 2 m square spacing. Initially some viscous liquid slurry came out through the annulus between mandrel hole and vertical drain. Thereafter clear water was released through the vertical drain. Subsequently, more sand was placed stage by stage up to +9 m CD throughout the silt pond.


Pilot Embankment
In order to investigate the deformation and pore pressure behaviour of the slurry-like soils, soil instrument clusters were installed after filling to +4 m CD. Instruments were installed in typical clusters including surface settlement plates, deep settlement gauges, pneumatic piezometers, electric vibrating-wire piezometers, open-type piezometers and water stand-pipes. The arrangement of each cluster in plan and elevation is shown in Figures 20.


การแปล กรุณารอสักครู่..
ผลลัพธ์ (ไทย) 3:[สำเนา]
คัดลอก!
รูปที่ 13 ธรณีพารามิเตอร์กับความลึกหลังจากที่เฟสแรกของทรายกระจาย ( ) ความหนาแน่น ( B ) ดัชนีสภาพคล่อง ( C ) ปริมาณน้ำ&ขีดจำกัดแอตเทอร์เบิร์ก ( D ) อัตราส่วนช่องว่างหลังทรายกระจาย ( e )
ดัชนีการบีบอัด ( F ) ค่าสัมประสิทธิ์ของการ ( G ) ความดัน preconsolidation ( H ) overconsolidationratio
( i ) ด้านกำลังรับแรงเฉือนด้วยใบพัดพลัง ( J ) ความไวจากเวนทดสอบความล้มเหลวในทรายกระจาย

แบ่งปันแม้ว่าการดูแลมากถ่ายตอนที่ทรายกระจาย , ความล้มเหลวที่เกิดขึ้นในสถานที่หนึ่ง เนื่องจากการ unevenness ของเตียงสระน้ำเดิม ทราย การเปลี่ยนแปลงความหนาของฝาก กระบวนการของไส้ทรายพยายามที่จะบรรลุความหนาของชั้นทรายในแต่ละ ,อย่างไรก็ตาม การสอบสวนหลังจากเฟสแรกของทราย ทรายกระจาย พบการก่อตัวที่แตกต่างจาก 1 ถึง 7 เมตร ความหนา เกิดความแตกต่างในโหลดเพิ่มเติมและความดันที่แตกต่างกันจากอ่อนเติมสารละลายต้องพลัดถิ่นไปยังตำแหน่งที่มีความดันต่ำ และเติมสารละลายออกมาผ่านบางทรายหมวกอยู่ใกล้ศูนย์กลางของบ่อตะกอน .หลักฐานของความล้มเหลวชนิดนี้ได้รับการยืนยันในการโพสต์ตรวจสอบโดยใช้การทดสอบการเจาะล้างไม่น่าเบื่อ กรวย ดัตช์ และทางทะเล . ยาวขึ้น พบในดินตะกอน บ่อ บนพื้นที่ 700 เมตร โดย 500 เมตรและดินได้ยาวขึ้นสูงเป็น 2 MCD . สภาพของตะกอนบ่อเสียหลังจากความล้มเหลวสามารถมีลักษณะเป็นของเหลวข้นนุ่มมาก .พื้นที่ความล้มเหลว คือ แสดงในรูปที่ 14


รูปที่ 14 รูปแบบของการจัดวาง geofabric ในศูนย์ของตะกอนบ่อ


เสริมมาตรการยาวขึ้นโคลนที่สถานที่ที่ล้มเหลวถูกลบออกโดยความจุสูง submersible ปั๊มโคลน . หลังจากเอาบางส่วนของ 0 MCD โคลน ,จีโอเท็กซ์ไทล์แรง 150 KN / M 150 KN / M กับมิติของ 700 เมตร โดย 900 เมตร อยู่ในชั้นเหนือความล้มเหลวที่ตั้งและพื้นที่โดยรอบ ก่อนเติมทรายกระจาย รายละเอียดของการออกแบบและการก่อสร้างที่ถูกกล่าวถึงโดย na et al . ( 1998 ) รูปแบบของการจัดวาง geofabric จะแสดงในรูปที่ 14

ทรายกระจายระยะที่ 2ตามตำแหน่งของแผ่นใยสังเคราะห์ในตะกอนบ่อ เฟสที่สองของทรายกระจายต่อ เพื่อให้ทรายจะกระจายได้ถึง 4 เมตร ซีดีที่มีการแพร่กระจายโดยรอบเรือ , บรรจุในระดับความสูงเพิ่มขึ้นถึง 6 เมตร ซีดี และระดับน้ำในบ่อตะกอนที่ต่อมาได้เพิ่มขึ้นถึง 5.5 เมตร ซีดีการสำรวจอุทกศาสตร์ พบว่าหลังจากจบเฟสนี้ทรายกระจายไปตรวจสอบที่เกิดขึ้นจริงที่สร้างขึ้นจากทรายมากกว่า geofabric . วิธีนี้คือการกระจายของทราย จนถึงระดับความสูงของตะกอนบ่อถึง 3.8 M 4 ซีดี มัน 8 เดือนจึงถึงความสูง 4 เมตร ซีดีทั้งหมดมันใช้เวลา 18 เดือนจากจุดเริ่มต้นของเฟสแรกของทรายกระจาย รวมถึงตำแหน่งของ geotextile
กลางกรวยมินิเจาะทดสอบ
เมื่อเติมระดับทรายตะกอนบ่อถึงประมาณ 4 เมตรซีดี 100 ตัวเลขของนาวิกโยธินมินิกรวยเจาะทดสอบโดยใช้ 3 ตัน seacalf ขนาดเล็กติดตั้งบนลอย โป๊ะ ( รูปที่ 15 )วัตถุประสงค์ของการทดลองนี้ มีวัตถุประสงค์เพื่อศึกษาความหนาของกระจายทราย เพื่อตรวจสอบความสำเร็จของทรายกระจายและตรวจสอบความเป็นไปได้ของความล้มเหลวใด ๆ ท้องถิ่นต่อไป กรวยขนาดเล็กเจาะทดสอบ พบว่า แนวโน้มของการเพิ่มขึ้นของความต้านทานเชิงลึกให้กับกรวยทรายพบข้างบน geofabric .แนวโน้มนี้ได้รับการยืนยันจากการก่อตัวของทรายในความหนาเพียงพอ กระจายผ่านแผ่นใยสังเคราะห์ . นอกจากนี้ มินิ พคท. ยังหยิบเลนส์ของทรายซึ่งดูเหมือนจะบุกรุกเข้ามาในสารละลายในขั้นตอนแรกของทรายกระจาย โดยทั่วไปการวัดความต้านทานกรวยโปรไฟล์มินิ–กรวยที่แสดง infigure 16ความหนาของทรายโปรไฟล์ที่กำหนดโดย cpts หลังจากถึง 4 เมตร ซีดีจะแสดงในรูป 17and 18 มันสามารถเห็นได้ในตัวเลขเหล่านี้ ว่ามีการสร้างขึ้นของ 8 ถึง 11 เมตร ความหนาของเม็ดทรายบนวัสดุบ่อตะกอน .

รูปที่ 15 มินิ - seacalf

รูปที่ 16 เป็นกรวยต้านทานโปรไฟล์หลังจากทรายกระจาย

รูปที่ 17ข้าม sectionl โปรไฟล์แสดงสะสมของทรายหลังทรายกระจาย .
( ตีความจากมินิ พคท.


รูปที่ 18 ความหนาของทราย ทรายกระจายสร้างขึ้นหลังจากตีความจากมินิ พคท. ข้อมูล


คุณสมบัติของดินหลังทรายกระจาย
หลังจากทรายเต็มถึง 4 ม. CD ระดับกาลหลาย boreholes ศึกษาถึงพัฒนาการของสารละลาย .การเพิ่มความหนาแน่นในการลดอัตราส่วนช่องว่างและมีความชื้นเพิ่มขึ้นเล็กน้อย ความดัน preconsolidation และค่ากำลังรับแรงเฉือนได้จดทะเบียนจากห้องปฏิบัติการผล boreholes ชั่วคราว จะเห็นได้ว่าดัชนีสภาพคล่องของด้านบน 7 ถึง 10 เมตร มีเอกภาพ และยังสูงกว่าอัตราส่วนช่องว่างข้างบน 2ดังนั้นวัสดุได้ถึงความลึก 10 เมตร ยังอยู่ในขั้นตอนการผลิต . การเปรียบเทียบค่าพารามิเตอร์ธรณี ก่อนและหลังการเวนคืน 4 M ระดับซีดีจะแสดงในรูปที่ 19 ( F )


รูปที่ 19 . การเปรียบเทียบพารามิเตอร์ของปฐพี ก่อนและหลัง ทรายกระจาย ( A )
ความหนาแน่น ( B ) ปริมาณน้ำ ( C ) ขีดจำกัดแอตเทอร์เบิร์ก ( D ) ดัชนีสภาพคล่อง ( E )
อัตราส่วนช่องว่าง( f )
preconsolidation ความดันลดระดับน้ำบาดาล
เฟสถัดไปของการก่อสร้างในตะกอนบ่อคือการลดของดิน น้ำใน siltpond 3 ม. CD เพื่อระบายแนวตั้งสำเร็จรูปสามารถติดตั้งที่ความสูง 4 เมตร ซีดีงานนี้มีการเปิดช่องระบายน้ำท่อควบคุมที่ติดตั้งในตะกอนทรายในบ่อทรายกระจายก่อนที่จะเริ่มต้นใหม่ของกิจกรรม ภายในร่องลึกร่วมกับโครงการ dewatering ปั๊มให้เร่งลดระดับน้ำใต้ดิน .
ติดตั้งท่อระบายแนวตั้งและสมี
หลังจากทรายไส้หลุด 4 ถึง 10 เมตร ชั้นทรายหนาหนา overlies ความเข้มข้นในเซี่ยงไฮ้ . เนื่องจากกระบวนการที่ช้าของการบรรจุรวมกับช้า dewatering , โหลดเพิ่มเติมในสารละลายค่อยกำหนด อย่างไรก็ตาม แรงดันในน้ำยังสูง เนื่องจากปริมาณน้ำที่ระบายออกรูขุมขนถูกจำกัด . เพื่อที่จะปล่อยความดันท่อระบายแนวตั้งถูกติดตั้งที่ระยะ 2 เมตร ตาราง ตอนแรกมีน้ำข้นหนืด ทะลุวงแหวนระหว่างหลุมงูสายน้ำผึ้งและท่อระบายแนวตั้ง หลังจากนั้นล้างออกด้วยน้ำระบายแนวตั้ง ต่อมาทรายถูกวางขั้นตอนโดยขั้นตอนซีดีเอ็ม 9 ตลอดตะกอนบ่อ .



นักบินคันทางเพื่อตรวจสอบความผิดปกติ และพฤติกรรมของแรงดันของน้ำ เช่น ดิน กลุ่มตราสารดินติดตั้งหลังบรรจุ 4 M CD เครื่องมือที่ถูกติดตั้งในกลุ่มทั่วไป รวมถึงจานการตั้งถิ่นฐานผิวลึกที่เกจ์วัดลม , piezometers สั่น piezometers ลวดไฟฟ้า piezometers ชนิดเปิดและท่อทนน้ำการจัดเรียงของแต่ละกลุ่มในการวางแผนและระดับความสูงจะแสดงในรูป

20
การแปล กรุณารอสักครู่..
 
ภาษาอื่น ๆ
การสนับสนุนเครื่องมือแปลภาษา: กรีก, กันนาดา, กาลิเชียน, คลิงออน, คอร์สิกา, คาซัค, คาตาลัน, คินยารวันดา, คีร์กิซ, คุชราต, จอร์เจีย, จีน, จีนดั้งเดิม, ชวา, ชิเชวา, ซามัว, ซีบัวโน, ซุนดา, ซูลู, ญี่ปุ่น, ดัตช์, ตรวจหาภาษา, ตุรกี, ทมิฬ, ทาจิก, ทาทาร์, นอร์เวย์, บอสเนีย, บัลแกเรีย, บาสก์, ปัญจาป, ฝรั่งเศส, พาชตู, ฟริเชียน, ฟินแลนด์, ฟิลิปปินส์, ภาษาอินโดนีเซี, มองโกเลีย, มัลทีส, มาซีโดเนีย, มาราฐี, มาลากาซี, มาลายาลัม, มาเลย์, ม้ง, ยิดดิช, ยูเครน, รัสเซีย, ละติน, ลักเซมเบิร์ก, ลัตเวีย, ลาว, ลิทัวเนีย, สวาฮิลี, สวีเดน, สิงหล, สินธี, สเปน, สโลวัก, สโลวีเนีย, อังกฤษ, อัมฮาริก, อาร์เซอร์ไบจัน, อาร์เมเนีย, อาหรับ, อิกโบ, อิตาลี, อุยกูร์, อุสเบกิสถาน, อูรดู, ฮังการี, ฮัวซา, ฮาวาย, ฮินดี, ฮีบรู, เกลิกสกอต, เกาหลี, เขมร, เคิร์ด, เช็ก, เซอร์เบียน, เซโซโท, เดนมาร์ก, เตลูกู, เติร์กเมน, เนปาล, เบงกอล, เบลารุส, เปอร์เซีย, เมารี, เมียนมา (พม่า), เยอรมัน, เวลส์, เวียดนาม, เอสเปอแรนโต, เอสโทเนีย, เฮติครีโอล, แอฟริกา, แอลเบเนีย, โคซา, โครเอเชีย, โชนา, โซมาลี, โปรตุเกส, โปแลนด์, โยรูบา, โรมาเนีย, โอเดีย (โอริยา), ไทย, ไอซ์แลนด์, ไอร์แลนด์, การแปลภาษา.

Copyright ©2024 I Love Translation. All reserved.

E-mail: