4. If the requirements of the external environment and the size of the raw material that is not specified in the standard references, respectively, according to the Drawing and do consult with a supervisor or higher level Leader. Reviewing every time before it is assigned to the Inspection report.
ผลลัพธ์ (ภาษาอังกฤษ) 2:
4. The provision of external conditions and the size of the raw materials that do not specify a table as a reference standard Drawing and consult with the Leader supervisors to scrutinize all times prior to the Inspection report.
ผลลัพธ์ (ภาษาอังกฤษ) 3:
4. The requirements of external conditions and the size of raw materials not specified in schedule and refer to the มาตรฐานตาม Drawing to consult with supervisor level. Leader up the determine every time before setting down in Inspection report