Depending on the application configuration, there will be 2 possible closing operations:
- Direct closing without synchronization (“Black start”) if no voltage in the outlet busbar.
- Closing with synchronization (“start with coupling to the mains”) if there is voltage in the outlet busbar. In this case the closing signal is controlled by the generator control unit.