SYSTEM TEST:
• A system test is performed to ensure proper function of installed
hardware and software.
• Ensure the operator control system and PLC programming comply
with CRS- and/or with process function- and operation description.
• A system test is carried out according to defined and valid test
procedures.
DOCUMENTATION:
• Hardware documentation
• User manuals
• General system description
• PLC programming
• Installation instruction
I/O LIST:
Signal property list with I/O addresses in the control system is
generated based on the signal list and contains:
• Address and terminal number in I/O cabinet
• Address and terminal number in junction box, where used