Racks that are supported by the access floor shall be bolted to the cement slab or a metal
channel secured to the slab by threaded rods that penetrate through the floor tiles.
Sharp edges on the top of the threaded rods shall be covered using domed nuts or other method.
Exposed threads under the access floor should be covered using split tubing or other method.