Tenderer are to note that the description in the schedule of works are only indicative.
Tenderers shall refer to the drawings to appreciate the extent and nature of each item of work and shall not base their prices only on the descriptions.
The overall sizes mentioned are approximate and Tenderers shall satisfy themselves as to the actual dimensions required in relation not only to the overall size but also in respect of actual and individual panel sizes.
The sizes stated are based on size visible from elevations. The Supplier shall allow for reveals at windows, columns, etc.,
Sizes indicated for curved panels are based on developed area.
Tenderers shall design, fabricate, supply and erect the works in accordance with the geometrical profile as shown in the drawings and in compliance with the requirements of the specifications, tender documetns and all local authorities.
Tenderers shall note that the dimensions given are approximate only and cannot be used for fabrication. The Supplier shall verify all dimensions on site and submit shop drawings to the Project Manager for his approval before fabrication.
Tenderer are to note that the description in the schedule of works are only indicative. Tenderers shall refer to the drawings to appreciate the extent and nature of each item of work and shall not base their prices only on the descriptions. The overall sizes mentioned are approximate and Tenderers shall satisfy themselves as to the actual dimensions required in relation not only to the overall size but also in respect of actual and individual panel sizes. The sizes stated are based on size visible from elevations. The Supplier shall allow for reveals at windows, columns, etc., Sizes indicated for curved panels are based on developed area. Tenderers shall design, fabricate, supply and erect the works in accordance with the geometrical profile as shown in the drawings and in compliance with the requirements of the specifications, tender documetns and all local authorities. Tenderers shall note that the dimensions given are approximate only and cannot be used for fabrication. The Supplier shall verify all dimensions on site and submit shop drawings to the Project Manager for his approval before fabrication.
การแปล กรุณารอสักครู่..
